Evergreen Line Rapid Transit Project

by on Apr.02, 2015, under Featured

The Evergreen Line Rapid Transit project is a 11 kilometre (6.8 mi) long rapid transit line being built to connect Coquitlam to Vancouver via Port Moody and Burnaby.  The line will include seven SkyTrain stations.

The Evergreen Line will seamlessly connect to the current SkyTrain network, including the Expo and Millennium Lines, and will integrate with the Canada Line and with regional bus and West Coast Express networks.

Gastaldo Concrete is proud to be the supplier of concrete pumping, placing and finishing services for the Evergreen Line Project

Comments Off on Evergreen Line Rapid Transit Project more...

Cell-Crete™ Lightweight Cellular Concrete

by on Oct.19, 2010, under Featured

Cell-Crete as a roadway fill provides a solid, load reducing base ideal for roads over poor sub-grades. Once the heavier, unstable soil is removed, Cell-Crete is installed and produces a strong, stable but lightweight concrete base. The resulting cellular concrete road base significantly reduces differential road settlement and, consequently, the costs associated with road maintenance and repair.

Comments Off on Cell-Crete™ Lightweight Cellular Concrete more...

The Port Mann Bridge Project

by on Oct.19, 2010, under Featured

The Port Mann/Highway 1 Improvement Project includes construction of a new 10-lane Port Mann Bridge, removing the existing crossing, widening the highway, upgrading interchanges and improving access and safety on Highway 1. The project spans a distance of approximately 37 kilometres from the McGill Street Interchange in Vancouver to 216 Street in Langley.

As the concrete pump service provider for all segments of the Port Mann/Highway 1 Improvement Project, Gastaldo Concrete is proud of our involvement on the project and of our work with Kiewit-Flatiron.  With a proven record for exceptional service on large scale projects, our fleet of Putzmeister pumps, skilled pump operators and experienced cement masons are always at the ready to provide the service and support required, day or night.

  

Comments Off on The Port Mann Bridge Project more...

2002 Putzmeister ID#02P46

by on Aug.18, 2010, under Featured

2002 Putzmeister ID#02P46

PumpSize: 46 meter
Truck Model: Mack MR
Horsepower: 400
Transmission: 10 speed

  • 12,608 engine hours
  • 2,968 pump hours
  • 120,889 Miles
  • New tires, pipes & elbows, cups, wear parts and mixer motors
  • New fluids and filters



ABSOLUTLEY BEAUTIFUL AND IN GREAT WORKING CONDITION!!!

$235,000 USD